PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

4) Inside Formwork for Foundation Wall at Col Line 2.5.JPG 5) Slip Form Prep (2).JPG 6) Fire at Auto Body Shop.JPG 7)Fire at Auto Body Shop (2).JPG 8) Fire at Auto Body Shop (3).JPG
Previous page 8) Fire at Auto Body Shop (3)
8) Fire at Auto Body Shop (3)